The 2Africa cable is complete – now comes the hard part: fixing the middle and last mile.

When Meta and its consortium partners confirmed the core completion of the 2Africa subsea cable system, the announcement reverberated far beyond the engineering world. At 45,000 kilometers (inclusive of the…

Continue ReadingThe 2Africa cable is complete – now comes the hard part: fixing the middle and last mile.
Read more about the article Power ‘No Longer a Problem’ for African Data Centers.
BETHANIstudios

Power ‘No Longer a Problem’ for African Data Centers.

Nigeria’s data-center leaders say power generation is no longer the biggest obstacle to scaling digital infrastructure - reliability and distribution are. That was the consensus at the Hyperscalers Convergence Africa conference in Lagos, where industry…

Continue ReadingPower ‘No Longer a Problem’ for African Data Centers.

Telcos pivot toward MVNO partnerships as Nigeria’s telecom sector embraces shared infrastructure model.

Following the successful Africa Hyperscalers MVNO Conference, which put in perspective the sector’s realities and opportunities, Nigeria’s telecom landscape is witnessing a strategic shift as major mobile network operators (MNOs)…

Continue ReadingTelcos pivot toward MVNO partnerships as Nigeria’s telecom sector embraces shared infrastructure model.